Excellent
4.9 out of 5 star rating on Trustpilot
Trustpilot
Snagging Survey

Snagging Survey Daventry

RICS regulated surveyors nationwide
Instant online quotes & booking
4.7/5 on Trustpilot
Aerial property survey view
ITV News TV Appearance The Times Featured AI Tech Company The Guardian - Homemove Insert Feature

Daventry new-build snagging, done properly

Daventry's new-build edge is busy. Our snagging inspectors work across the big phase-led schemes around Ashby Road and A425 Staverton Road, where a home can look finished long before it is finished. We walk the property with a trade eye, document every defect with photos, and produce a report you can send straight to the developer. Prices start from £295 for 1-2 bed homes, £375 for 3 bed houses, £450 for 4 bed houses, and £550 for 5+ bed homes, with the same pricing for pre-completion inspections.

The scale here matters. Daventry North East Sustainable Urban Extension is planned for 3,400 dwellings, Micklewell Park is approved for 450, and Malabar on the western edge is moving ahead with up to 1,100 homes. That kind of pipeline means repeated handovers, phased landscaping, and builders juggling live plots, which is exactly where small defects slip through. Our reports give the developer a clear list to fix, before the 2-year defects period starts counting down against you.

snagging in DAVENTRY

Daventry Property and New-Build Snapshot

£358,172

Average asking price

£263,982

Average sold price

351

Residential sales in the last 12 months

4,950+

Planned homes in named local schemes

100-250

Typical snags per new-build home

Using listing data from home.co.uk and property data from homedata.co.uk

What a Snagging Inspection Catches

A proper snagging inspection goes far beyond scuffs on a wall. Our inspectors pick up paint and plaster defects, doors that do not latch, windows that do not seal, missing sealant around baths and worktops, and sockets that are out of square. In a place like Daventry, where homes on Micklewell Park and Malabar are handed over in phases, those small issues are rarely isolated. They tend to repeat across plots, which is why a trained eye matters.

We also look for construction defects that a buyer would struggle to spot on a quick walk-through. Uneven floors, gaps in skirting, badly fitted kitchens, loose stair nosings, poor loft insulation at the eaves, and garden levels that do not match the specification all show up in our reports. A buyer's solicitor will not crawl into a loft or test the latch on every internal door, and that is exactly where new-build defects hide.

Then there are the defects that need a sharper line in the report. Fire stopping, ventilation, drainage falls, structural cracks beyond normal shrinkage, and missing or damaged cavity tray details are not cosmetic extras, they are the things that can turn into warranty arguments later. On a site linked to West Northamptonshire Council planning reference DA/2020/0100, where the brief includes schools, a local centre, and highway works, those checks become even more relevant because the plot is only one part of the job. We do not just spot what looks untidy. We document what is wrong.

  • Paint and plaster defects
  • Windows and doors not performing properly
  • Kitchen, bathroom and sealant faults
  • Fire stopping, ventilation, drainage and structural concerns

Typical Snags by Property Size

1-2 bed home 118 snags
3 bed home 145 snags
4 bed home 176 snags
5+ bed home 210 snags

Source: Homemove snagging inspections benchmark, 100 to 250 snags per home

Why You Need It Before Completion, Or Within 2 Years

Before legal completion, the leverage is stronger. Our inspectors can visit the plot at the right time, record pre-completion snags, and send a report while the builder still has the cleanest route to fix items. Under NHBC Buildmark, Premier Guarantee, and LABC New Home Warranty, the first 2 years are the defects period, which is the window where most snagging issues should be put right by the developer.

After 2 years, the warranty narrows towards structural cover only. That means paint blemishes, poor sealant, sticking doors, and many of the everyday new-build defects that frustrate buyers are much harder to pursue later. A pre-completion inspection in Daventry, or a first-week inspection if keys are already in your hand, puts the evidence on paper while the job is still live.

Why You Need It Before Completion, Or Within 2 Years

How the process works

1

Quote

Send us the address, the plot number if you have it, and the house type. We confirm the right inspection type and price, whether you are buying at Malabar, Micklewell Park, or another Daventry site.

2

Instruction

Once you book, we confirm the timing and any access notes. For pre-completion work, we align the visit with the builder so the inspection happens before completion wherever possible.

3

Access

We coordinate the site visit with the sales team or site manager. That matters on phased developments off Ashby Road and Staverton Road, where access rules can shift from plot to plot.

4

Inspection

Our inspector spends around 3-6 hours on site, depending on size and layout. We check the finish, the function, and the compliance-sensitive items that often get missed on a quick handover walk.

5

Report

You receive a full photo-illustrated report within 2-3 working days. It is written so you can send it to the developer, keep it for the builder's reply, and use it if escalation is needed later.

Do not let the handover rush you

If you can, get the snag list agreed before completion. Once the keys change hands, your position weakens fast, and items that should have been fixed at handover can turn into a post-move dispute. On a Daventry plot at Malabar or Daventry North East, that can mean chasing the site team after trades have already moved on.

Local New-Build Considerations in Daventry

Daventry is not a one-site town. The local pipeline includes Daventry North East Sustainable Urban Extension, Malabar on Land at Malabar Farm, A425/Staverton Road, and Micklewell Park off Ashby Road, plus phases tied to different planning permissions. DA/2020/0100 brings a local centre, two primary schools, a secondary school, country park extension work, and highway infrastructure into the picture. DA/2019/0750 at Malabar has already brought one- to five-bedroom homes and later phases with more shared ownership stock. Big, staged schemes like that create the same snag pattern again and again. Boundary treatments are late. Turf levels are off. Road edges are unfinished.

West Northamptonshire Council is the planning authority here, so local planning conditions matter. They often sit around drainage, highways, open space, and phasing, which is why our snagging inspectors pay attention to the external bits as much as the kitchen or bathroom. Malabar is a good example, because the homes include solar panels, smart heating systems, and EV charging points. Those features need more than a glance. We check controls, penetrations, finish around service routes, and the sort of commissioning issues that only show up when the property is tested properly.

homedata.co.uk records show NN11 0 house prices fell by 0.6% over the last year, while Daventry saw 351 residential sales in the same period. That market backdrop does not change the inspection, but it does change the pressure on buyers at handover. People want to complete, move in, and get on with life. Builders know that too. A clear snagging report, backed by photos and room-by-room notes, keeps the conversation on defects rather than excuses.

  • Daventry North East Sustainable Urban Extension
  • Malabar on A425/Staverton Road
  • Micklewell Park on Ashby Road
  • West Northamptonshire Council planning control

Using Your Snag List With the Developer

We format the list so the developer can work through it without guessing. Each defect is numbered, photographed, and grouped by room or external area, which makes it much easier for the site manager to brief the right trade. A neat list also helps when the same issue appears on more than one plot, something we see on phase-led Daventry schemes more often than buyers expect.

If the builder drags its feet, the report becomes the starting point for escalation. Under the relevant new-build warranty, the developer is normally the first contact for the 2-year defects period, but the warranty provider can be used if the builder does not respond. NHBC, Premier Guarantee, and LABC all have routes for unresolved defects, and our report is written to sit neatly inside that process.

Using Your Snag List With the Developer

Frequently Asked Questions

When should I book a snagging inspection in Daventry?

Before legal completion is the best point, because the builder still has the easiest route to fix defects before you get the keys. If completion has already happened, we still book inspections within the 2-year defects period under NHBC Buildmark, Premier Guarantee, or LABC New Home Warranty.

How long does a snagging inspection take?

Most Daventry inspections take around 3-6 hours, depending on the size of the home and how much external work is ready. A 1-2 bed flat is usually quicker than a 5+ bed house on a larger plot at Malabar or Micklewell Park.

What counts as a snaggable defect?

Anything that is unfinished, badly fitted, not working as it should, or not built to the expected standard can be snaggable. That covers cosmetic defects such as paint, plaster, and sealant, plus functional and construction issues such as sticking doors, leaking seals, uneven floors, missing fire stopping, and poor drainage falls.

Who pays for the snagging survey?

The buyer pays for the inspection. The developer is normally responsible for putting defects right under the warranty and the sale contract, but the inspection itself is commissioned by you.

Can the developer refuse to fix items on the snag list?

Yes, they can dispute items that they say are wear and tear, damage after completion, or outside the warranty terms. That is why the wording, photos, and timing matter so much, especially on a pre-completion inspection where the defect is recorded before keys are handed over.

Is NHBC the same as the builder?

No. The builder is the party that should carry out the remedial work, while NHBC, Premier Guarantee, or LABC are the warranty bodies that back the home. If the builder does not act, the warranty provider's process may be the next step.

What if I have already moved in?

It is still worth booking. Many buyers in Daventry do not realise how many issues sit behind a fresh coat of paint until they have lived with the home for a week or two, and you still have the 2-year defects period to raise them.

What if the home is outside Daventry town centre?

We still cover the wider NN11 area and the surrounding towns. The same snagging standards apply whether the plot is off A425 Staverton Road, Ashby Road, or part of a smaller edge-of-town release.

Other Services

Sort Your Snagging Survey From Anywhere

Excellent
4.9 out of 5 star rating on Trustpilot
Trustpilot
Snagging Survey
Snagging Survey Daventry

Independent defect checks for new-build homes in NN11

Get A Quote & Book
RICS regulated surveyors nationwide
Instant online quotes & booking
4.7/5 on Trustpilot

Most surveyors take 1-2 days to quote.

We'll price your survey in seconds.

Get Your Instant Quote
4.7/5 on Trustpilot | Trusted by thousands
ITV News TV Appearance The Times Featured AI Tech Company The Guardian - Homemove Insert Feature

Homemove is a trading name of HM Haus Group Ltd (Company No. 13873779, registered in England & Wales). Homemove Mortgages Ltd (Company No. 15947693) is an Appointed Representative of TMG Direct Limited, trading as TMG Mortgage Network, which is authorised and regulated by the Financial Conduct Authority (FRN 786245). Homemove Mortgages Ltd is entered on the FCA Register as an Appointed Representative (FRN 1022429). You can check registrations at NewRegister or by calling 0800 111 6768.